Back to Research

A Strategy for Engaging Stakeholders on Lead in Drinking Water

Public HealthStakeholder Engagement

Rhode Island is estimated to have between 75,000 and 120,000 lead service lines still in the ground, concentrated in older cities like Providence and Pawtucket, with a full replacement cost of roughly $1.8 billion and nearly half the state's service lines missing basic material records entirely.

This strategy responds to the EPA's 2024 revised Lead and Copper Rule, which requires every water system to map its lead pipes and remove them within a decade, by proposing a coordinated, inter-agency stakeholder engagement approach targeting a 20% annual replacement rate. The paper centers the civil rights dimension of the crisis, since the burden falls hardest on lower-income neighborhoods with the least capacity to track or fund remediation on their own.

Rhode Island's lead lines

Up to 120,000 lead lines, four in ten service lines of unknown material, and a target of one-fifth a year

Estimated lead service lines still in the ground

025k50k75k100k125k

75,000–120,000 lines · $1.8 billion to replace

Service lines with no recorded material

4 in 10

Replacement pace the plan steers by

20%20%20%20%20%

EPA rule (2024): all lead lines out within 10 yearsRhode Island law: 2033 deadline

How the plan defines success

  • 1 in 5 lines replaced each year
  • 8 in 10 children below 3 µg/dL blood lead
  • 3 in 4 stakeholders say the process works
Estimates from the plan (NRDC, 2023; Rhode Island Current, 2024; RIDOH dashboard, February 2025). The one-fifth pace is the plan’s steering target; deadlines are the EPA’s 2024 Lead and Copper Rule Improvements and Rhode Island’s Lead Poisoning Prevention Act.